CDE websites use cookies. Please click "Accept and Close" to accept the use of cookies on our website. By continuing to browse our website you consent to the use of cookies on this website.
For more information on how we use cookies please visit our Cookie Policy page, or visit our Privacy Notice page for more information on how we manage and use data.
Request a callback

Thank you for choosing to request a callback.

Please fill in the short form below and we will get back to you shortly

Please tick box if you would like to keep up to date with all the latest product news, events and projects from CDE Global. *

x

Resolve Aggregates Open Day

27 June 2018

CDE and Resolve Aggregates are delighted to be hosting a Demonstration Event at Resolve Aggregates' site in Ravenna, Texas, on Wednesday 27th June. The Open Day will provide visitors with a unique opportunity to see the latest wet processing technologies implemented by CDE.

Generic Image

About the CDE project with Resolve Aggregates 

The plant is installed in Ravenna since 2017 with equipment including the M4500 modular wash plant, the AggMax portable logwasher, the Counter Flow Classification Unit (CFCU), the EvoWash fines recovery unit and the AquaCycle thickener. In April 2017, following 16 months of the equipment being used at Fort Worth, the equipment was relocated to a newly acquired sand deposit in Ravenna, Texas. After being structurally relocated and installed, the modular plant was re-commissioned by CDE the following May.

Operating as Resolve Aggregates, this plant has allowed the company to address key issues they were experiencing with their existing material.

These included:

  1. The need to produce in-spec, finished products in a single pass
  2. Reduce the environmental impact of their operation by lowering water consumption
  3. Reduce the footprint of their plant
  4. Reduce operational costs

The CDE equipment installed at the Resolve Aggregates site in Ravenna currently produces 100k pm of sand & gravel including: 

  • C33 concrete sand
  • #8 pea gravel
  • #57 gravel
  • C144 masonry sand
  • Asphalt sand

Reduction in Water Consumption

As well as improving the material that Resolve Aggregates now produce, the CDE equipment has also enabled the company to significantly lower their water consumption. Their old plant required 6000 GPM, but now the plant is only needing 260gpm to run.

Commenting on the CDE installation, Keith Newell, President of Resolve Aggregates said, “The quality of equipment design and the strength of its manufacturing are truly remarkable, as is the precision with which the plant fits together. Perhaps most important, the AquaCycle thickener greatly diminishes our freshwater requirements."

Check out the event details below, and complete the registration form to register your attendance for the CDE Demo Day at Resolve Aggregates.

Date: Wednesday 27th June

Start time: 9.00am

End time: 3.00pm

Site location: 7066 W FM 1753, Ravenna TX 75476-7060

(Light refreshments and lunch will be served)

 

We can help source accommodation for before or after the event should it be required.
Please let us know if you have any questions and we will get back to you as soon as we can.